Step 1

Select install location

  • Locate a spot in the middle of the rain garden where the soil is bear/free from plants.
  • We need to install in the middle of the rain garden to ensure quality data.
Step 2

Auger hole for node

  • At the selected location, use a post hole digger to make a hole for the node.
  • Take your time so as to not disturb the soil too much.
  • Use a tape measure to make sure the hole is 3 feet deep.
  • The soil removed from the hole will fill roughly 2 buckets
  • Fill the first bucket with topsoil
  • When the soil begins to look like clay, switch to filling the second bucket
Step 3

Install GI node

  • Set the GI node into the 3 ft hole.
  • Do your best to make sure it is straight in the ground.
  • Pack the topsoil from the first bucket around the node to make sure it is secure in place. You shouldn't need to use any soil from the second bucket
  • If the surrounding plants are too tall, shading the solar panel, use the shears to trim the plants.
Step 4

Confirm GI node is reporting

  • Fill out the deployment form on AirTable.
  • Once installed, confirm the GI node is reporting to the internet by going to its designated website.