FIXONIC
SellSavedMy Fixonic
Official iFixit API visual reference

Airox Legendair Turbine Box Replacement

When whirring noises persist after...

iFixit Library Airox Legendair Moderate 25 minutes Guide 134179
Open the authorised source
Licensed iFixit integration

This attributed iFixit guide is displayed through Fixonic's recorded commercial API permission. iFixit remains the independent source and author of the procedure.

Guide overview

Before you begin

When whirring noises persist after troubleshooting the Airox Legendair, it may be mandatory to replace the turbine box. This guide will help walk the operator step-by-step through the process of replacing the turbine box. The repair guide information is mentioned in following sections of the user repair manual: · Chapter 2 – 2.1.1 Cleaning the Device · Chapter 2 – 2.4.1 Opening and Closing · Chapter 6 – 6.1 Removal/Installation of the Turbine Box with Wiring

Step 1

Repair step

  • First, switch off the device.
Step 2

Repair step

  • Place the device in a clean and open environment.
Step 3

Repair step

  • Using a cloth or a sponge slightly dampened with a bactericide or germicide solution, gently clean the outside of the device.
Step 4

Repair step

  • If necessary, spray the device lightly with the germicide solution, taking account of the requirements discussed in the preliminary operations.
  • Do not allow any liquid to enter inside the device (in particular through the cooling apertures).
Step 5

Repair step

  • Use a gentle air blast to clear away any remaining liquid from ventilator.
Step 6

Repair step

  • Make sure to turn off the ventilator before starting the repair.
  • Put the device in a clean and open environment.
  • Thoroughly clean the device before beginning any work.
Step 7

Repair step

  • Open the device by removing the five attachment screws (Pl1.20) on the bottom casing side (Pl1-280). Lift off the top outer panel.
  • Carefully separate the two casings to avoid tearing off the keypad connections.
Step 8

Repair step

  • Unscrew the three attachment screws (Pl1-130) for the CPU board (Pl1-120).
Step 9

Repair step

  • Disconnect all connectors Pl1.J1.CT, Pl1.J2.CT of the turbine control board.
Step 10

Repair step

  • Extract the turbine casing (Pl1.50) from its housing and uncouple the flow rate measurement block (Pl1-260), the O2 supply pipes and the piezo solenoid valve.
Step 11

Repair step

  • Place the turbine box (Pl1-50) in a clean and open environment
  • Remove the four screws, washers and spacers (Pl1.70, Pl1.80, Pl1.90) in order to successfully extract the turbine control board (Pl1.60).
Step 12

Repair step

  • Disconnect the box from the turbine control board (Pl1.J6.CT).
Step 13

Repair step

  • Replace the turbine box (Pl1-50).
  • Replace the turbine control board (Pl1.60) on the box with four screws, washers and spacers (Pl1.70, Pl1.80, Pl1.90) (Torque 5 Nm max.).
Step 14

Repair step

  • Connect the box to the turbine control board (Pl1.J6.CT).
  • Couple the flow rate measurement block (Pl1-260) to the casing and connect the two O2 supply pipes and the piezo solenoid valve.
  • Then, reinsert the assembly into its housing. Put the cone support (Pl1-50) into place. Put the additional cone support (Pl1-220) also into place.
Step 15

Repair step

  • Reconnect all connectors (Pl1.J1.CT, Pl1.J2.CT) to the turbine control board.
Step 16

Repair step

  • Reinstall the CPU board (Pl1-120) with the three attachment screws (Pl1-130) (Torque 5 Nm max.)
  • Close the device again, taking all necessary precautions (see Step 2-3)