FIXONIC
SellSavedMy Fixonic
Official iFixit API visual reference

Wacker Concrete Vibrator M1500120 REV 100 2016 Power Cable Replacement

Use this guide to remove or replace the power...

iFixit Library Wacker Concrete Vibrator M1500120 REV 100 2016 Moderate 15 - 30 minutes Guide 141437
Open the authorised source
Licensed iFixit integration

This attributed iFixit guide is displayed through Fixonic's recorded commercial API permission. iFixit remains the independent source and author of the procedure.

Guide overview

Before you begin

Use this guide to remove or replace the power cable on a Wacker M1500-120 REV 100 (2016) Concrete Vibrator.

Step 1

Disconnect the flex shaft

  • Before starting, ensure the device is unplugged from power.
  • Pull up on the quick-disconnect handle to release the lock on the flex shaft.
  • Remove the flex shaft.
Step 2

Remove the housing screws

  • Use a T20 Torx screwdriver to remove the nineteen screws securing the two halves of the device housing.
Step 3

Remove the dust filter

  • Lay the device down onto its right side, screw holes facing up.
  • Remove the rear dust filter.
Step 4

Separate the halves

  • Lift to remove the left half of the device housing.
  • If the housings feel stuck together, use a flathead screwdriver to create a gap between the halves.
Step 5

Lift up the switch

  • Lift the switch out of its recess in the case housing.
Step 6

Disconnect the power wires

  • Use a pair of needle nose pliers to disconnect the black and white power wires from their terminals on the switch.
Step 7

Remove the power cable clamp

  • Use a T20 Torx screwdriver to remove the two screws securing the power cable clamp to the housing.
Step 8

Repair step

  • Remove the power cable clamp.
Step 9

Remove the power cable assembly

  • Lift the power cable assembly up and away from the device.
Step 10

Remove the reinforcing sleeve

  • Slide the reinforcing sleeve up and off of the power cable.
Step 11

Repair step

  • Only the power cable remains.