FIXONIC
SellSavedMy Fixonic
Official iFixit API visual reference

Dangle Earrings Jump Ring Replacement

This guide will teach you to easily repair and...

iFixit Library Jewelry Easy 20 - 30 minutes Guide 147574
Open the authorised source
Licensed iFixit integration

This attributed iFixit guide is displayed through Fixonic's recorded commercial API permission. iFixit remains the independent source and author of the procedure.

Guide overview

Before you begin

This guide will teach you to easily repair and replace a small metal jump ring on a dangle earring that may have broken. This guide is applicable to any dangle earring with a stud or hoop and can be easily done at home within 30 minutes. To ensure a successful repair carefully follow the step provided with the listed parts.

Step 1

Repair step

  • Locate where the earring stud/hook has detached.
  • Look at the two pieces of the dangle earrings for a small loop or jump ring on both pieces.
Step 2

Repair step

  • Using a chain nose plier, carefully grip the jump ring by its side.
  • Use a cutting plier to cut a small opening in the loop.
Step 3

Repair step

  • With both pliers use the cutting plier to gently grip the side of the small jump ring.
  • Using the small nose chain pliers pull back on the small jump ring to create an opening.
Step 4

Repair step

  • With the small chain nose pliers grip the jump ring.
  • Insert the stud/hook portion of the earring into the jump ring.
Step 5

Repair step

  • Use the jump ring to reattach the the stud.
  • With the small chain nose pliers grip the jump ring.
  • Insert the main portion of the earring into the jump ring with the stud/hoop.
Step 6

Repair step

  • Use both pliers to close the loop.
  • Firmly grip the edge of the loop using a pair of cutting pliers.
  • With a pair of small chain grip pliers gently push the end of the jump ring forward to close the loop.
Step 7

Repair step

  • Gently tug on either side of the earring to ensure the loop is closed securely.
  • If this test fails, refer back to step 6.