Step 1

Repair step

  • Image of the initial light fixture with fluorescent tubes + starter, one of the tubes is broken (does not turn on) installed in a garage (private parking).
Step 2

Repair step

  • Disconnect the power supply to the light fixture. Remove the 2 tubes to prevent them from breaking during handling.
  • Teardown of the light fixture by removing the 2 mounting screws from the ceiling.
  • Disconnect the power supply terminal block.
  • Photos 2 and 3 show everything hidden inside the light fixture: the tube holders, wiring, and 2 ballasts.
Step 3

Repair step

  • If you have a non-contact voltage tester or voltage detector, verify that there is no power in the wire hanging from the ceiling.
  • It is advisable to test the voltage tester on a live outlet to ensure it is working correctly.
  • If you removed the terminal blocks along with the light fixture, reattach them to the wires.
Step 4

Repair step

  • Flip the light switch to determine which position is ON and which is OFF; if you already know this, you can skip this step.
Step 5

Repair step

  • We proceed with the teardown of everything that will be removed when converting the luminaire from fluorescent tubes to an LED luminaire.
  • Before disassembling, in this case we can observe what the fault was with the tube that was not working: a nearly loose wire at the starter connection.
Step 6

Repair step

  • Exploded views of the breakdown. "You learn from everything".
Step 7

Repair step

  • Step 1: Uninstall the ballast from the inductive energy system that was installed in most "old" luminaires with fluorescent tubes.
Step 8

Repair step

  • Cut the cable tie securing the wiring and locate the one for one of the ballasts; you can cut its wires.
Step 9

Repair step

  • Disconnect the wiring and remove the ballast.
Step 10

Repair step

  • Perform the same procedure with the 2nd reactor.
Step 11

Repair step

  • Next step, teardown of the tube holders.
  • We must determine which side the screen will be powered from, and we will concentrate or place the 2 single tube holders on that side. (Currently, we have one at each end of the screen) as these will power the LED tubes.
Step 12

Repair step

  • Teardown of the single tube holder and transfer to the other side of the display where the 2 single ones will be installed.
Step 13

Repair step

  • Remove the tube holder with the starter holder and move it to the other side, so that the 2 single ones are on one side and the 2 combined tube holder + starter assemblies are on the other side.
Step 14

Repair step

  • Now it's time to prepare the tube holders + starter; remove everything we don't need.
  • Photo 1: Cut the 2 wires from these.
  • Photo 3: Cut off the starter mount; if we don't, we can't install both of this model on the same side, "they won't fit."
Step 15

Repair step

  • Photo 1: We see the primer holder to be removed.
  • Photo 2: We see the holders now cut and separated.
  • Photo 3: We see the tube holders reinserted into the chassis; this side is now finished, as it becomes a mere support without any power wiring.
Step 16

Repair step

  • Insert the single tube holder on the side where the LED tubes will be powered.
Step 17

Repair step

  • We level the wires to cut them all to the same length.
  • In electrical work, there is a very useful premise that, unfortunately, is not usually applied in electronics. (I come from the world of electronics, and I now apply it there as well.)
  • "Cables should be as long as possible, so they are easy to handle" since, in electrical work, you are often working in uncomfortable positions while up on ladders.
Step 18

Repair step

  • We coil one cable from each tube holder together; this will be the Phase F wiring, for example.
  • We cut the ends to the same length, strip approximately 1 cm, and twist the tips together.
  • We proceed to do the same with the second pair of cables, which will be the Neutral N.
Step 19

Repair step

  • View of all the material that has been uninstalled and removed from the light fixture.
  • Photo 2: View of the tools used in the modification.
Step 20

Repair step

  • Views of the wiring already prepared to reposition the luminaire, showing the interior and the "inert" tube support end.
Step 21

Repair step

  • Bend the wires to insert them into the terminal block.
  • Once inserted into the terminal block, tighten the terminal block screws.
Step 22

Repair step

  • With the cables gathered so they do not rub against the screw supporting the light fixture, we screw it back onto the ceiling.
Step 23

Repair step

  • Regardless of the manufacturer, LED tubes are powered ONLY from one side, the one marked with L and N, plus printed silkscreen labels.
  • CAUTION; BE VERY CAREFUL, the other side, for many manufacturers, comes bridged, = short-circuited, so if you insert them on the wrong side and flip the switch, THE POWER WILL TRIP AT THE ELECTRIC frame, DUE TO A DIRECT SHORT CIRCUIT.
  • The "starter" that many manufacturers include with the tubes IS NOT A STARTER, IT IS A jumper (wire), which would be used if we do not perform Steps 14 and 15; if we do not remove the starter holder, we would need this jumper (wire) to close the circuit, otherwise the tube will not work.
Step 24

Repair step

  • Photo 1: View of the tube connection point with the L and N terminals.
  • At the other end, to prevent accidents, this manufacturer has placed a type of transparent plastic sleeve to insulate the terminal. It is better that we do not remove it.
Step 25

Repair step

  • For information purposes only: As we can see in the photos, at the end of the tube, the terminals are short-circuited (I have removed part of the sleeve to be able to take the measurement).
Step 26

Repair step

  • A tip:
  • If possible, mark the side on the screen where the power supply is currently located; this will help avoid future errors or accidents.
Step 27

Repair step

  • Once the screen is installed on the ceiling:
  • 1st With the switch off, install the 1st tube.
  • 2nd Flip the switch and verify that it works.
  • 3rd Turn the switch off.
  • 4th Install the 2nd tube.
  • 5th Flip the switch; if everything is correct, both tubes should be on and the task is complete.