FIXONIC
SellSavedMy Fixonic
Official iFixit API visual reference

Disassembling Garbage Disposal

This guide provides a comprehensive process for...

iFixit Library Garbage Disposal Moderate No estimate Guide 169045
Open the authorised source
Licensed iFixit integration

This attributed iFixit guide is displayed through Fixonic's recorded commercial API permission. iFixit remains the independent source and author of the procedure.

Guide overview

Before you begin

This guide provides a comprehensive process for inspecting and repairing your garbage disposal, including testing and replacing faulty components. Common Issues: Loud noises when the motor runs.Water leaking from the bottom of the disposal.Fuses or circuit breakers tripping upon starting the disposal. Safety Measures: Power Disconnection: Turn off the circuit breaker or unplug the disposal.Clear Identification: Ensure you disconnect only the disposal's power source to avoid affecting other appliances.

Step 1

Confirm the Problem

  • Operation Test: Run the disposal to check for specific symptoms like unusual sounds or tripping of the overload protector (reset button).
  • Observation: Pay close attention to the type of noise and any response from the overload protector.
Step 2

Evaluate External Setup

  • Installation Check: Confirm that the disposal is properly installed as per the manufacturer's guidelines.
  • Voltage Verification: Check the voltage supply to the disposal using a voltmeter. The standard range should be between 108 and 132 volts.
Step 3

Disposal Removal

  • Position a bucket or towels under the disposal to catch any residual water.
  • Disconnecting Lines: Remove the drain line and, if applicable, the dishwasher drain hose.
  • Unlocking Process: Use a service wrench to rotate the mounting flange counterclockwise, carefully supporting the disposal to prevent it from falling.
Step 4

Disposal Disassembly

  • Place the disposal upside down on a sturdy surface.
  • Depending on the model, remove the outer shell and segregate the disposal into its main parts: hopper, drain housing, rotor/shaft assembly, stator, and lower-end bell.
  • Label each wire and part for easy reassembly.
Step 5

Inspection and Testing

  • Hopper Examination: Look for cracks or corrosion, especially near connections.
  • Gasket Inspection: Check for damage on gaskets and O-rings, replacing them if needed.
  • Switch and Rotor Check: Test the centrifugal switch’s movement and inspect the rotor for wear.
  • Electrical Testing: Use a multimeter to test the capacitor, windings, and switches. For the capacitor, observe the meter as it charges and discharges. Check stator windings for continuity and inspect the start switch for open circuits.