FIXONIC
SellSavedMy Fixonic
Official iFixit API visual reference

Kaffelogic Nano 7/LINK (A/B/C-N Serial) Mainboard Replacement

Replacement of the mainboard on any Kaffelogic...

iFixit Library Kaffelogic Coffee Roaster Moderate 30 minutes Guide 197302
Open the authorised source
Licensed iFixit integration

This attributed iFixit guide is displayed through Fixonic's recorded commercial API permission. iFixit remains the independent source and author of the procedure.

Guide overview

Before you begin

Replacement of the mainboard on any Kaffelogic Nano or Nucleus Link coffee roaster with an A, B, C or N prefix serial number.

Step 1

Removing Panel Screws

  • Unplug the roaster from mains power before proceeding. Do not perform any of these steps on a live/powered unit.
  • Remove the 6x 2.5mm Hex screws on the left and right side of the roaster.
Step 2

Lift the closure

  • Hold the roaster steady while removing the plastic top/closure.
  • Panels may spring apart slightly once removed.
Step 3

Remove bottom panel screws

  • Remove the 4x 2.5mm Hex screws on the bottom of the roaster.
Step 4

Remove the front panel

  • Pull away the front panel carefully.
  • Take care not to damage the buttons while maneuvering the front panel.
Step 5

Remove rear panel

  • Stand the roaster up again and pull away the rear panel from the chassis to expose the remaining components.
  • The mains cable is routed through the panel and it will remain attached, place the panel in a soft bag if you wish to protect the paint throughout the rest of your repairs.
Step 6

Boards may vary

  • Boards may vary, the PCB in your roaster may not look like the one in this guide, but the steps should still match the general replacement process.
  • All replacement boards will have a USB-C connection. You will have to migrate any custom profiles on your USB stick to the onboard storage with Kaffelogic Studio.
Step 7

Disconnect the SSR signal

  • Pull upwards on the SSR signal connector to remove it.
Step 8

Disconnect the thermocouple

  • Use a 2.0mm slotted screwdriver to remove the thermocouple wires from the PCB-A
Step 9

White thermocouple connector

  • If your thermocouple connector looks like this, you will need to follow this step.
  • Use the end of a cable tie or very small plastic spudger to open the contact and remove your thermocouple wires. You may need to trim the cable tie end to fit into the slot.
Step 10

Remove motor controller signal

  • (Applicable to early models) Pull upwards on the motor controller signal connector to remove it.
  • Black wire to the left when replacing.
Step 11

Disconnect/desolder the motor

  • Unplug your motor if your roaster is fitted with a connector, otherwise de-solder the motor controller power.
Step 12

Disconnect the ribbon cable

  • Carefully pull on the ribbon cable to remove it.
  • Some boards have a larger cable on the other side of the PCB.
Step 13

Remove PCB screws

  • Remove the 4x PH2 PCB screws.
Step 14

De-solder the power wires

  • Prepare your soldering iron and de-solder/reflow the two transformer wires to remove them.
Step 15

Remove the board

  • Your mainboard is now removed and ready for rework or replacement. Replace the serial code on the bottom of your roaster with the included QR label.
  • Head through to our wiki for instructions on recalibrating your fan speed and setting the voltage and element resistance after replacing the mainboard.
  • Nucleus Link anemometer calibration instructions can be found here.