FIXONIC
SellSavedMy Fixonic
Official iFixit API visual reference

Bauer T16 Sound, replacing 3 belts

This guide describes how to replace the three...

iFixit Library Bauer T16 Sound Moderate 1 - 3 hours Guide 213406
Open the authorised source
Licensed iFixit integration

This attributed iFixit guide is displayed through Fixonic's recorded commercial API permission. iFixit remains the independent source and author of the procedure.

Guide overview

Before you begin

This guide describes how to replace the three drive and friction belts of the Bauer T16 Sound. The enclosed repair PDF shows the components and the important belt routing; keep pages 5 and 8–9 ready while working. The long rewind belt must run correctly around the idler pulley. The flat belt must lie in the fork of the switch for 18/24 frames per second.

Step 1

Preparing and opening the projector

  • Unplug the power cord, remove any loaded film, and allow the lamp and projector to cool down completely.
  • Pull off the power switch rotary knob on the front and release the deep-set housing screws on the back cover.
  • Carefully remove the back cover. Pay attention to the cables connected to the built-in speaker and do not pull on them.
  • Only work on the projector when it is disconnected from the power supply. Do not touch any power connections or exposed electrical components.
Step 2

Set the motor and transformer aside

  • Document the position of the wires and cable lugs. Disconnect the cable lugs marked on page 5 of the PDF from their receptacles.
  • Loosen the transformer mounting and fold it to the right as shown on page 5.
  • Loosen the motor mounting and pull the motor upward out of its rubber mounts. Set it to the right as well.
  • The motor and transformer remain partially wired. Support them and do not pull on the remaining wires.
Step 3

Remove the old belts

  • Note the routing of all three belts and remove the old belts or their fragments.
  • Compare the replacement belts with the removed set and the diagrams in the PDF. Keep belts and running surfaces free of oil and grease.
Step 4

Installing the small friction belt

  • Loosen the three screws of the shaft unit marked in red on page 8.
  • Lift the shaft unit about 5 mm and place the small friction belt onto its rollers.
  • Fully reseat the shaft unit into its original position and fasten the three screws.
Step 5

Installing the flat belt

  • Loosen the bearing block marked in yellow on page 8 and lift the shaft with the pinion gear enough to guide the flat belt underneath it.
  • Place the flat belt onto the large pulley. Guide it through the fork of the belt front derailleur as shown on page 9.
  • Reinstall the shaft and bearing block correctly and tighten the two mounting screws.
Step 6

Routing the long rewind belt

  • If necessary, open the boom arm cover as shown on page 9. Route the long rewind belt around its pulleys as shown in the photos on pages 8–9.
  • The routing around the idler pulley must match the PDF; otherwise, the spool will rotate in the wrong direction.
  • Check that all belts are fully seated in their grooves, and close the boom cover again.
Step 7

Assemble the projector

  • Place the motor and transformer back into their original brackets. Ensure the rubber mounts are seated correctly and fasten the previously removed screws.
  • Reconnect the previously removed cable lugs to their original terminals. Check that no wire is pinched.
  • Reinstall the back panel and dial before connecting the projector to the power supply.