FIXONIC
SellSavedMy Fixonic
Official iFixit API visual reference

Disassembling the ABB DPA UPScale UPS for capacitor and cooling fan replacement

This guide shows the disassembly of an ABB DPA...

iFixit Library ABB DPA UPScale Modul Moderate 3 - 4 hours Guide 238759
Open the authorised source
Licensed iFixit integration

This attributed iFixit guide is displayed through Fixonic's recorded commercial API permission. iFixit remains the independent source and author of the procedure.

Guide overview

Before you begin

This guide shows the disassembly of an ABB DPA UPScale UPS in the 10 kVA and 25 kVA versions in preparation for replacing the capacitors and cooling fans. The UPS can be powered from several sources, particularly from the mains and batteries. Even after switching off, the DC intermediate circuit may remain charged.

Step 1

Removing the Top Cover

  • Begin only after all energy sources for this UPS have been deactivated and the absence of voltage has been confirmed. Disconnecting from the mains alone does not rule out battery or DC link voltage.
  • Remove the seven marked screws with a suitable PH1 screwdriver and lift off the cover.
  • Insert the driver bit fully and press it straight so you do not damage the soft screw heads.
  • Keep the screws sorted by their installation position.
Step 2

Removing the Right Side Cover

  • Remove the 4 marked screws and remove the cover.
  • Insert the driver bit completely to avoid damaging the screw heads.
Step 3

Disconnect the main and side boards

  • Document the marked cable connections and release them at the connector housings.
  • Release any existing locking mechanisms before you disconnect the plugs. The Steckverbinder erkennen und lösen guide helps distinguish between the different types.
  • Do not pull on or bend the delicate ribbon cables.
Step 4

Disconnect the connections to the front cover

  • Slide the black locking latch toward the ribbon cable as shown in the second photo and carefully pull the ribbon cable out.
  • Carefully release the other connector from the socket by its housing.
  • Do not kink the ribbon cables and do not apply lateral force to their connections.
Step 5

Note the fan wire

  • I severed the fan wire at the red marked point to remove the front cover.
  • Do not sever the wire until the appropriate replacement and the subsequent connection assignment are confirmed. A confirmed reconnection sequence is not yet documented.
Step 6

Unscrew the front panel

  • Remove the four marked screws with a suitable screwdriver.
  • Insert the driver bit fully so that the screw heads are not damaged.
Step 7

Remove the front panel

  • Carefully pull the loosened front panel off towards the front.
  • When reassembling, slide the upper lip of the front cover back under the chassis edge.
  • Take care that no cable gets snagged or pinched.
Step 8

Partially release the side PCB

  • Remove the marked screw.
  • Press the clips one after another with the needle nose pliers and pull the PCB forward carefully: first the top right, then the bottom right, and finally the bottom left.
  • Keep this screw separate from the previously removed fasteners.
Step 9

Remove cable holders

  • Cut the zip ties from both holders without damaging the wires.
  • Use needle nose pliers to release the two clips as shown in image 3 and pull them out toward the front.
  • Save undamaged holders for reassembly. Replace the cut zip ties.
Step 10

Remove the upper PCB

  • M3x8mm with washer and spring washer; torque: 1.1 Nm.
  • M3x12mm with washer and spring washer; torque: 1.1 Nm.
  • M4x15mm with washer and spring washer; torque: 2.0 Nm.
  • M4x15mm with washer and spring washer; torque: 1.9 Nm.
  • M4x15mm with washer and spring washer; torque: 2.6 Nm.
  • M4x15mm with washer and spring washer; torque: 1.4 Nm.
  • M3x6mm, plastic: tighten only fingertip-tight.
  • Remove the screws, the PCB, and the underlying film. Set all parts aside. Check the specified torque values against the service specifications for your UPS model and the respective screw connection. Tighten the screws according to these specifications using a calibrated torque tool.
Step 11

Remove the lower PCB

  • 5.5 mm hex standoff.
  • 5.5 mm hex standoff (black).
  • M3 PH1 screws.
  • Release the fasteners and store them separately. Document the position of the blue and black wires. Guide them under the PCB through the opening as shown in image 2 and carefully lift the PCB out.
Step 12

Cleaning the Housing and Removing the Thermal Paste

  • Clean the housing and remove the old thermal paste, without damaging any components or insulating films.